Customization: | Available |
---|---|
Model No.: | Hfklt2-II |
Switch Potency: | AC/DC24-380V |
Still deciding? Get samples of US$ 20/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Overview:
Two-way pull rope switch is widely used in steel, cement, power plants, mines and other plants with belt conveyors, the
product is installed on both sides of the tape conveyor, is used in the tape conveyor emergency stop a kind of protection
switch, pull the wire rope at any point within the switch operating distance, cut off the operating circuit to stop the whole
line, to achieve the protection of the tape machine and personal safety.
Working principle:
When an emergency occurs at the tape transport site, pull the wire rope tied to the lugs to make the slider in the machine
Work with the switch to signal a stop. Release the wire rope and press the reset bar to reset.
Product Parameters :
Product Name | Pull Cord Switch | Model | HFKLT2-II / KLT2 |
Reset mode: | Manual and automatic reset | Environmental temperature | -30ºC--- +60ºC |
Relative Humidity | less than 85% | No. of contacts | 1NO1NC /2NO2NC |
Action Angle | 30° | Action force | 10kg |
Limit Angle | 60° | Current | 1.5A |
Reliability | >106 times | Contact capacity | AC380V /DC220V |
Structure characteristics:
The switch is made of high quality travel switch, with long use mission.
Good sealing, with the advantages of dustproof, shockproof, anti-corrosion, etc.
The housing adopts cast aluminum casting, light weight and high hardness.
Installation And Use:
The switch is balanced on the fixed bracket of the frame; Tie the wire rope to the pull ring at the upper and lower ends of
the pull rope switch, with the wire rope not exceeding 40 meters on each side (should be shortened to 25 meters when
there is a slope). The pull rope pressure should be appropriate to ensure reliable reset of the switch. setting the pull rope
along the parallel direction of the tape, adding a lifting ring every 3 meters.
Product Display
Q1: Would you accept OEM/ODM ?
A1: Yes,we accept.OEM/ODM has a MOQ requirement.
Q2: Can we get samples ?
A2: Yes,you can get sample to test quality,but the freight for express is on buyer's account.
Q3: What's the payment term ?
A3:T, Western Union, MoneyGram,Paypal etc.
Q4: How's the delivery time ?
A4: Normally is 3-10 work days, lf the quantity is large,We need to negotiate.
Q5: What is the standard of package ?
A5:Normally are cartons, but also we can pack it according to requirement.
Q6: Could you offer Form E, C/O etc ?
A6: Sure, We can apply to CCPIT.
Q7: Are you a trading company or a manufacture ?
A7:We are the manufacturer& exporter in the industry so we can supply product for you with factory price.