Customization: | Available |
---|---|
Protection: | IP65 |
Max. Voltage: | 24-380V |
Still deciding? Get samples of US$ 60/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Two-way Pull Cord switch is widely used in steel, cement, power plants, mines and other plants with belt conveyors, the product is installed on both sides of the tape conveyor, is used in the tape conveyor emergency stop a kind of protection switch, pull the wire rope at any point within the switch operating distance, cut off the operating circuit to stop the whole line, to achieve the protection of the tape machine and personal safety.
Product Name | Pull rope switch | Model | HFKLT2-II / KLT2 |
Reset mode: | Manual and automatic reset | Environmental temperature | -30ºC--- +60ºC |
Relative Humidity | less than 85% | No. of contacts | 1NO1NC /2NO2NC |
Action Angle | 30° | Action force | 10kg |
Limit Angle | 60° | Current | 1.5A |
Reliability | >106 times | Contact capacity | AC380V /DC220V |
Structure characteristics:
The switch is made of high quality travel switch, with long use mission.
Good sealing, with the advantages of dustproof, shockproof, anti-corrosion, etc.
The housing adopts cast aluminum casting, light weight and high hardness.
Installation And Use:
The switch is balanced on the fixed bracket of the frame; Tie the wire rope to the pull ring at the upper and lower ends of
the pull rope switch, with the wire rope not exceeding 40 meters on each side (should be shortened to 25 meters when
there is a slope). The pull rope pressure should be appropriate to ensure reliable reset of the switch. setting the pull rope
along the parallel direction of the tape, adding a lifting ring every 3 meters.